The proposed Tunnel is a 1995 answer to new challenges California faces in 2022.At the end of July, the Department of Water Resources (DWR) dropped the environmental impact report (EIR) on the proposed Delta Conveyance Project. While the Newsom Administration is wasting time and failing to solve serious problems in the present, RTD is busy tackling the massive EIR document for the latest version of the tunnel.